The VirtECSĀ® Analyzer

Providing what-if scenario analysis, Monte Carlo sampling, and risk management.Ā 

With its scenario analysis capabilities, theĀ VirtECSĀ®Ā Analyzer tool allows manufacturing plants to look at all possible scheduling options with speed and detail that would have been previously unachievable.Ā Ā 

Scenario analysis for manufacturers can be incredibly valuable for process improvement, but most current spreadsheet or simulator methods are tedious and error prone.

The advanced features provided byĀ VirtECSĀ®Ā use powerful algorithms to help justify capital expenditures, target process improvements, and reduce manufacturing costs.Ā 

IN THIS GUIDE, YOU’LL LEARN:

W

HowĀ VirtECSĀ®Ā provides fast and detailed scheduling scenario analysis.Ā 

W

The most common questions users can answer usingĀ VirtECSĀ®Ā Analyzer.Ā 

W

VirtECSĀ®ā€™ ability to model each parameter and process within the plant, allowing for thorough examination.Ā 

W

The impressive results of a sample case study at a drug product manufacturing plant.Ā 

RECENT NEWS & INSIGHT

The Role of Digital Twins in New Product Development: Commercial Manufacturing

Bringing these new products to the commercial market creates a wide range of challenges for leading biopharma manufacturing facilities. Plants operations can often look drastically different once a new commercial manufacturing run is added to production. Our colleague...

The Role of Digital Twins in New Product Development: Clinical Manufacturing

The past several years have been a time of accelerated innovation in the biopharmaceutical industry and new drugs are being developed at a rapid rate. According to Deloitteā€™s 13th Annual Pharmaceutical Innovation Report, the top 20 global pharmaceutical companies...
Engineer in white coat working at manufacturing factory

How Manufacturing Production Schedule Changes Have Unexpected Effects on Site Operations

In many real-world manufacturing environments, disruptions occur frequently, forcing unexpected adjustments to their production schedules. Some of these disruptions, such as supply chain delays or equipment breakdowns, are simply inevitable, even for the most...

Reducing Capital Investment

“Using VirtECS, we were able to debottleneck our largest production facility by identifying a sequence of changes that we never could have evaluated with a spreadsheet model. We reduced the necessary capital investment by $300 million by demonstrating areas where more equipment did not benefit throughput.”

Senior Resource Planning Manager – Biopharma Industry

Big Time Savings

“VirtECS handles all of the ripple effects to the schedule when things change. That is a big time savings in a complicated process with lots of constraints. Not to mention making sure that you don’t miss a constraint!”

Finite Scheduler – Biopharma Industry

Most Powerful Solution

“I have evaluated more than a dozen process modeling software solutions and VirtECS is hands-down the most powerful for end-to-end capacity analysis”

Director of Manufacturing Science & Technology – Leading Pharmaceutical Company

Avoid Unexpected Pitfalls

“A Discovery project with APCI helped us to identify and avoid some pitfalls that we had not anticipated. With the initial process model in place we were able to roll right into a Finite Scheduling implementation”

Product Manager – Chemical Company

An Essential Tool

“I would not want to schedule this plant without VirtECS.”

Scheduler – Leading Pharmaceutical Company